Flexible and universal solution that meets the requirements of customer
- Due to developed standard modules base a substation of any complexity and configuration with wide
- range of power capabilities can be created within minimum period.
- It is possible to build a substation pursuant to the most common schemes 4H, 5H, 5AH.
- Modern design.
Shortest time to implement a project
- Configuration following the modular principle.
- Modular units are ready-to-operate:
- block-boxes manufacture, manufacture, installation and commissioning of equipment; preparation of utility network within of modular unit are carried out at the plant concurrently with main construction at a substation site;
- minimum term for construction and installation works;
- modules are assembled into a single unit directly on site.
Shipment by any transportation means to any part of the country. No additional approvals for transportation are required
- Modules are of a standard transportation size.
Maximum adaptation to a Smart Grid level transition
Reduction of time losses and financial expenses of a client, single responsibility
- No need to coordinate cooperating organizations due to work with a single contractor, having integrated competencies and experience at all stages of a project implementation.